← All articles Grinding KPIs · Best practice

Comminution Energy KPIs: kWh/t, Operating Work Index and Fair APC Baselines

How to measure grinding energy and throughput so that real improvements show up, and how to judge control results fairly

Best practice · 8 min read · 21 November 2026

Why energy deserves its own KPI

A 2012 AusIMM Mill Operators' Conference paper by Ballantyne, Powell and Tiang measured how much energy comminution uses at Australian gold and copper mines. Crushing and grinding took 52 % of site electricity on average. Measured against total site energy, where diesel for haulage weighs heavily, the share was 21 %. A later CEEC report, commissioned by an equipment supplier, put comminution at about a quarter of mine-site energy and up to 3 % of global electricity once quarrying and cement are included.

Whatever the exact share, the mills are the plant's largest electrical load. Yet daily reports often lead with tonnes per hour, which can hide a circuit that is spending more energy per tonne than it should.

The Indonesian context

For Indonesian operations the case is sharper. Government Regulation PP 33/2023 on energy conservation, which replaced PP 70/2009, makes energy management mandatory for industrial users consuming 4,000 tonnes of oil equivalent or more a year. The Ministry of Energy and Mineral Resources reported that 410 entities filed energy management reports for 2023, with savings of about 10.4 million barrels of oil equivalent.

Power is also largely coal-fired. Ember reported that coal supplied 61.8 % of Indonesia's power generation in 2023, and captive coal plants serving industry, nickel processing in particular, add substantially to that. For a concentrator on the grid, PLN's large-industry I-4 tariff was Rp 996.74/kWh in the fourth quarter of 2025. A kilowatt-hour saved in the mill is therefore both a cost saving and, in most cases, a reduction in coal burned.

Why tonnes per hour alone misleads

Throughput rises when ore is softer, when feed is finer, or when the grind is allowed to coarsen. None of these is an efficiency gain in itself, and the last can cost recovery in flotation. Giblett and Putland (AusIMM Mill Operators' Conference, 2018) suggest benchmarking a circuit on specific energy, media use, liner life, mill utilisation and grind size together, and note rule-of-thumb power utilisation targets of about 90 % of installed power for SAG mills and 95 % for ball mills.

KPIWhat it tells youWatch-out
Throughput (t/h per operating hour)Production rate while runningMoves with ore hardness and grind
Specific energy (kWh/t)Energy per tonne milledState the basis: motor input or pinion
Product P80 (um)Whether the grind target is heldNeeds a reliable sampler or online sizing
Operating work index Wio, and Wio/WiEnergy used vs energy expected for this ore and size reductionLarge survey-to-survey scatter; trend it
Utilisation and availability (%)Time the circuit is producingSeparate planned and unplanned downtime
Variability (std. dev. of load, power, P80)How hard the circuit is to run near its limitsThe first thing good control improves

Operating work index: energy used versus energy expected

Bond's equation gives the specific energy W (kWh/t) needed to grind from a feed size F80 to a product size P80 (both in micrometres): W = 10 x Wi x (1/sqrt(P80) - 1/sqrt(F80)). Rearranged with the measured energy, it gives the operating work index: Wio = W / (10/sqrt(P80) - 10/sqrt(F80)). In closed circuit, F80 is the fresh feed and P80 the circuit product.

The ratio Wio/Wi compares plant and laboratory. Below 1 the circuit is grinding more efficiently than Bond predicts; above 1 it is using more energy than the ore requires. Bond's correction factors (for example for fine grinding or for mill diameter) should be applied so both numbers are on the same basis. In the illustrative example below, a ball mill using 12 kWh/t to grind from 2,000 to 150 micrometres has a Wio of about 20 kWh/t against a laboratory Wi of 15, a ratio of 1.35, or roughly 3 kWh/t above expectation.

Operating work index compared with the laboratory work index (illustrative)
Figure 1 - Operating work index compared with the laboratory work index (illustrative)

Use it with care. The Sustainable Minerals Institute reported that across ten surveys of one circuit the operating work index varied about threefold, while size-specific energy (kWh per tonne of new -75 micrometre material) was far more consistent. In one SABC circuit the two measures even disagreed on whether the SAG or the ball mill was the more efficient. A good practice is to track both and to trend them, not to judge on a single survey.

Benchmarking against peers

The CEEC Energy Curves, developed with JKMRC and hosted by CEEC International, plot comminution energy per tonne or per unit of metal against cumulative production, much like a cost curve, and keep site data anonymous. According to the University of Queensland's Sustainable Minerals Institute, the curves draw on data from nearly 60 % of world copper operations and over 30 % of gold operations. CEEC describes four uses: tracking a site's position year on year, comparing design options with current operations, mapping the gains from efficiency strategies, and finding opportunities at machine level.

For predicting what a circuit should use, Morrell's SMC-based method sums energy for each size-reduction stage. Its published worked example takes the same ore from 100 mm to 106 micrometres in about 18.3 kWh/t through an SABC circuit, 16.5 kWh/t through crushing and ball milling, and 16.4 kWh/t through HPGR and ball milling. Comparing the plant's actual energy with a prediction of this kind is what Giblett and Putland mean by giving a benchmark context; they report throughput gains of around 15 % at Barrick sites from benchmarking-led improvement work.

Predicted specific energy for the same ore and grind in three circuit types (SMC Testing worked example)
Figure 2 - Predicted specific energy for the same ore and grind in three circuit types (SMC Testing worked example)

Judging control improvements fairly

A survey of grinding circuit control by Wei and Craig (IFAC World Congress, 2008) found that respondents saw stability (71 %), throughput (54 %) and energy reduction (50 %) as the main sources of control benefit. After implementation, 89 % evaluated benefits by switching between old and new control, yet fewer than half were satisfied with their methods, and 47 % wanted base-case estimates built from historical data.

A MetPlant 2013 paper on SAG mill control at Ok Tedi shows why care is needed. Variability in power and bearing pressure fell by about 30 % and average power draw rose by 12 %, but the authors noted that the throughput gain could not be conclusively attributed to control because other changes happened in the same period.

  • Run alternating on/off blocks of a few shifts each rather than a single before-and-after comparison.
  • Normalise for ore: record a hardness indicator (lab Axb or Wi by ore type, or a power-based hardness estimate) and compare like with like.
  • Report t/h, kWh/t and P80 together, so a coarser grind is not counted as a gain.
  • Agree the baseline period and the KPIs with operations before the trial starts.

What a lower kWh/t is worth

As an illustration only, consider a 1,000 t/h grinding circuit using 14 kWh/t and running 8,000 hours a year: about 112 GWh. Each 1 % reduction in specific energy is about 1.1 GWh, worth roughly Rp 1.1 billion a year at the I-4 tariff; 5 % is about 5.6 GWh and Rp 5.6 billion. On a coal-heavy grid that is also coal not burned. These are Aeterna estimates, not site results.

Electricity cost avoided per year for a lower kWh/t on an illustrative 1,000 t/h circuit
Figure 3 - Electricity cost avoided per year for a lower kWh/t on an illustrative 1,000 t/h circuit

Practical takeaway

  • Put kWh/t and P80 next to t/h on the daily report, and state whether energy is measured at the motor or the pinion.
  • Calculate Wio/Wi monthly from routine surveys and trend it; investigate sustained rises.
  • Benchmark once against a model prediction or the CEEC Energy Curves to know how much room there is.
  • Measure variability: it is usually the first thing good control improves and the reason throughput can then rise.
  • For any APC project, agree an on/off trial design and an ore-hardness-aware baseline before switching it on.

Aeterna angle

ProcessOpt tracks specific energy, grind and variability alongside the controller, so the benefit of Model Predictive Control is measured rather than assumed, and our Rock Analyzer and Sound Analyzer give the feed-size and mill-load context needed for a fair baseline. If you would like to see where your grinding circuit sits on energy per tonne, we would be happy to review your data with you.

Common misconceptions

  • 'Higher t/h means the circuit is more efficient.' Softer ore or a coarser grind raise t/h without any efficiency gain.
  • 'One survey tells us the work index.' Wio can scatter widely between surveys; trend it and cross-check with size-specific energy.
  • 'Energy and throughput pull against each other.' Steadier operation near constraints often improves both.
  • 'A before-and-after comparison proves the APC benefit.' Ore and equipment changes in the same period can explain the difference; use on/off blocks.

Where sources disagree or are uncertain

  • Comminution's share of site energy depends on the basis: 52 % of electricity but 21 % of total energy in the 2012 Australian study; about 25 % in the vendor-commissioned CEEC report.
  • Operating work index and size-specific energy can rank the same mills differently (SMI); neither is a complete measure on its own.
  • The Barrick ~15 % gain comes from benchmarking-led improvement programmes, not from benchmarking alone.
  • The value example and Figures 1 and 3 are illustrative; the tariff is the published Q4 2025 PLN rate and changes quarterly.

Ask for a grinding energy review: we turn your power, tonnage and size data into kWh/t, Wio/Wi and variability trends and show where the energy goes.

Talk to an engineer

Sources

  1. Ballantyne, Powell and Tiang - Proportion of energy attributable to comminution (AusIMM 11th Mill Operators' Conference, 2012)
  2. Ballantyne and Powell - Benchmarking comminution energy consumption for improved efficiency (AusIMM 12th Mill Operators' Conference, 2014)
  3. SMI-JKMRC - METI Program: CEEC Energy Curves (University of Queensland)
  4. Mining Monthly - Improving comminution circuits
  5. CIM Magazine - New report highlights role of comminution in emissions reduction (2021)
  6. Giblett and Putland - The basics of grinding circuit optimisation (AusIMM 14th Mill Operators' Conference, 2018)
  7. Sustainable Minerals Institute - Quantifying the energy efficiency of fine grinding circuits
  8. 911 Metallurgist - How to calculate grinding mill operating efficiency
  9. SMC Testing - Use of Mia, Mib, Mih, Mic in predicting comminution circuit specific energy (Morrell method)
  10. Wei and Craig - Grinding mill circuits: a survey of control and economic concerns (17th IFAC World Congress, 2008)
  11. Savage, Rodriguez and Metzner - Hybrid process control strategy for the Ok Tedi SAG mill 2 (AusIMM MetPlant, 2013)
  12. ESDM - Implementation of energy management in 2023 (Ministry of Energy and Mineral Resources, Indonesia)
  13. CNBC Indonesia - PLN electricity tariffs per kWh, Q4 2025
  14. Ember - Record coal generation share in Indonesia and the Philippines (2024)