Mineral processing · SAG mill · Flotation

More revenue from the plant you already own.

Smart instruments built for mineral processing — Rock Analyzer, Froth Analyzer, Ball Counter and Fill Analyzer — give Model Predictive Control a head start, so your plant produces more, with care for the earth. Live in weeks.

+1–3%
production · t/h
3–8%
energy · kWh / t
3–8%
CO₂ · kg / t
PLANT_LOAD · % OF OVERLOAD LIMIT APC LIVE
OVERLOAD LIMIT APC ENGAGED → DISTRIBUTION μ MANUAL μ APC ↑ σ ↓ TIGHTER
Manual control — low mean, wide spread; productivity left on the table Aeterna APC — higher mean held tight at the limit, maximum stable output
Field notes · Where the losses hide

Where is your loss?

Product · six modules, one closed loop
Faster deployment

The APC gap is integration — not the math.

Most APC projects don’t stall on modelling; they stall at the integration with the plant’s DCS, SCADA, PLC, and historian stack. Our team has spent years inside those systems — OPC-UA bridges, PI historians, vendor-specific tag conventions, OT-network constraints — so the path from kick-off to running setpoints in production is measured in weeks, not quarters.

01 SCADA bridge & tag map

OPC-UA / DCS / historian wired up with our pre-built bridge. Plant tags mapped to the model, with the OT team in the loop. No new sensors.

02 Tune & validate

Advanced instruments and MPC tuned and validated against your historical and live data, reviewed against soft-sensor benchmarks and walked through with your metallurgists and process engineers.

03 Live on production

MPC online as operator advice first, then closed-loop on your terms. Operators stay in command; Aeterna holds the limit.

What Aeterna delivers

Three outcomes, one closed loop.

Comminution

higher throughput · consistent sizing

SAG, ball mill, pebble crusher, and classification coordinated as one optimisation problem. The circuit holds the true bottleneck instead of an operator’s safety margin, and P80 stays on target as ore hardness drifts.

Enrichment

better recovery · consistent grade

Live signals from the froth and grade-aware control of reagent, air, and pulp level — recovery held against ore drift, grade tightened where it pays. The plant stops chasing the assay and starts leading it.

Responsibility

efficient operation · better environment

Lower energy per tonne, tighter water-loop control, and less rework all compound into a smaller footprint per gram of metal. Production grows; the impact does not.

Why Aeterna

Process engineers first, software second.

We know the circuit

10+ years in mineral processing

Mineral processing, automation, and embedded-system engineers in one team. We understand the process end to end — from feed size to froth — and build instruments that answer the questions metallurgists already ask.

You stay in control

advice first · automation on your terms

ProcessOpt advises your existing DCS rather than replacing it. Safety and interlock logic stay exactly as commissioned, and your team decides when to move from advice to closed loop.

One platform underneath

instruments · models · control

Every product runs on the ProcessOpt platform, so instruments, the digital twin, and MPC share one data model. Our own automation hardware is in development for plants that want the whole stack from one team.

Worked example · live gold price

What the circuit is worth on a gold operation.

A 5 Mt/a gold plant, valued at the current spot gold price. The figure is the incremental revenue from the modelled throughput uplift — lower energy per tonne and recovery gains are additional upside.

Scenario assumptions
Ore milled5.0 Mt / yr
Head grade1.0 g/t Au
Recovery90%
Gold output (base)~144,700 oz / yr
Throughput uplift (MPC)1 – 3%
Spot gold price—
fetching live price…
Estimated annual benefit
—
incremental revenue from a 1–3% throughput uplift, at today's spot price
Added gold output—
Gold price (live)—
Base production144,700 oz/yr
Get a validated estimate for your circuit

Gross incremental gold revenue at the live spot price; excludes operating cost per tonne and additional upside from energy and recovery gains. A site study produces a net, plant-specific figure.

7-Day Free Trial

See your revenue gap — in 7 days, at no cost.

Get 7 days of full-licence access to explore the software. Provide 60–90 days of process data and we build an initial process model, simulate how Model Predictive Control would engage on your operation, and show you what it would improve — before any commitment.

Talk to us directly.

Tell us about your operation and we'll give you a straight answer — no pressure, just a conversation.